Professional experience
Vibration analysis for data-center gensets
Associate Engineer, Genset Packaging · Caterpillar Inc.
Jul 2025 – Present · Bangalore, India
Context
Data centers need a lot of reliable backup power, and Caterpillar’s generator sets (gensets) are getting bigger to match. Every new genset package goes through new product introduction (NPI) validation before it ships, and vibration is one of the things that has to be proven safe.
The rotational program
I joined through the 2025–26 Engineering Rotational Development Program (ERDP), with 3-month rotations at the Perkins Engine facility in Aurangabad and with the Genset NPI Program Management team in Bangalore.
Planning the tests
On the Genset Package Analysis team, I define NPI validation test requirements and build strain-gauge and vibration-gauge maps: where the sensors go and under which operating conditions to measure.
Analysing the data
I work as a vibration data analyst across several NPI projects. For each one I compare three sources:
- FEA predictions for the new design
- Test data from existing products as a baseline
- Validation test data from the new product
Putting them side by side shows whether the new package performs as expected and helps define acceptance criteria.
Result
The test-to-report cycle takes about one week, which keeps validation moving at the pace NPI timelines need.